Lemania Reference: BCASA-LEMANIA-T4

Lemania Energy T4 · 12V battery tester with a long 200 cm lead

Lemania's 12 V tester with a 200 cm lead: it easily reaches batteries tucked away in the boot, under a seat or deep in a boat.

  • ✓  Long 200 cm lead
  • ✓  12 V batteries
  • ✓  Lead-acid 100-2000, lithium 20-1000
  • ✓  Starting and charging test
  • ✓  Results by QR code
Free quote, no obligation

Request a quote for your Lemania Energy T4 · 12V battery tester with a long 200 cm lead

  • Reply in under 4 working hours
  • Best price guaranteed
Attach photo (optional)
Photo of the old battery or vehicle documentation · Max. 3 · 8 MB · images or PDF
Share
Not sure about the model?We will advise you by email Write to us

Lemania Energy T4 · 12V battery tester with a long 200 cm lead

In many modern cars the battery is no longer under the bonnet but in the boot or under a seat, and on a boat it can sit in an awkward locker. A long lead makes all the difference.

The Lemania Energy T4 is a 12 V battery tester with 200 cm of lead. It analyses lead-acid from 100 to 2000 CCA and lithium from 20 to 1000 CCA, checks starting and charging and detects faulty cells.

With no internal battery, an LCD screen, touch keys and QR code results, it sits in the palm of your hand (80 × 80 × 22 mm). If a 100 cm lead is enough, there is the T3.

How to use it, step by step

  • 1.  With the engine off, run the clamps to the battery and connect red to positive and black to negative.
  • 2.  Enter the standard and cranking rating from your battery label.
  • 3.  Run the battery test, then the starting and charging tests.
  • 4.  Check the result on screen or save it with the QR code.
  • 5.  Release the black clamp first, then the red.

Features

  • ✓  200 cm lead with clamps.
  • ✓  Tests 12 V batteries and the starting and charging systems.
  • ✓  Lead-acid from 100 to 2000 CCA and lithium from 20 to 1000 CCA.
  • ✓  Standards CCA, BCI, CA, MCA, JIS, DIN, IEC, EN, SAE and GB.
  • ✓  Detects faulty cells and shares results via QR code.
  • ✓  No internal battery, with reverse polarity protection.
  • ✓  LCD screen and touch keys; operates from 0 to 50 °C.
  • ✓  80 × 80 × 22 mm and 0.2 kg.

Technical data

Voltage12V
Lead-acid range100-2000 CCA
Lithium range20-1000 CCA
StandardsCCA, BCI, CA, MCA, JIS, DIN, IEC, EN, SAE, GB
TestsBattery, starting system and charging system
DisplayLCD
ResultsQR code
Reverse polarity protectionYes
Cable length200 cm
Operating temperature0 to 50 °C
Storage temperature-20 to 70 °C
Dimensions80 x 80 x 22 mm
Weight0.2 kg

  • Brand
  • Reference
    BCASA-LEMANIA-T4
  • MPN
    T4

lemania-t4-ficha-tecnica.pdf

Download (438.05KB)
Secure payment
Your payment details are encrypted.
24-hour shipping
To Spain and Portugal. 14-hour urgent service.
Free returns
No additional cost.

Viewed products

Loading...
Back to top