NOCO Reference: BCASA-NOCO-GCP1EX

NOCO GCP1EX · flush-mount inlet with a long 3.66 m lead for lorries, trailers or larger boats

When the charger sits at the far end of the vehicle, the GCP1EX's 3.66 m lead covers the distance on the inside.

  • ✓  3.66 m built-in lead
  • ✓  15 A rated capacity
  • ✓  14 AWG copper
  • ✓  Fits a 51 mm hole
  • ✓  Sealed cap with rubber gasket
Solve it now by chat Our assistant replies instantly about batteries, shipping and orders, and opens the request you need.
I prefer to fill in the form
Free quote, no obligation

Request a quote for your NOCO GCP1EX · flush-mount inlet with a long 3.66 m lead for lorries, trailers or larger boats

  • Reply in under 4 working hours
  • Best price guaranteed
Attach photo (optional)
Photo of the old battery or vehicle documentation · Max. 6 · 8 MB · images or PDF
Share
Not sure about the model?We will advise you by email Write to us

NOCO GCP1EX · flush-mount inlet with a long 3.66 m lead for lorries, trailers or larger boats

On a lorry, a trailer or a boat of some length, the best spot for an outside inlet is rarely next to the battery charger. The NOCO GCP1EX solves that with a built-in 3.66 m (12 ft) lead and a single outlet: the inlet sits on the side, handy for the extension lead, while the cable runs inside to wherever the charger or engine block heater is.

It is rated at 15 A with 14 AWG copper cable and fits without hard-wiring in a 51 mm (2″) hole using three self-tapping screws suitable for fibreglass, wood, plastic or metal. The snap cap with rubber seal keeps water out.

Getting the most out of it

  • 1.  Plan the inside route of the 3.66 m lead before you drill.
  • 2.  Cut a 51 mm hole at the chosen outside spot and push the inlet in.
  • 3.  Fix it with the three screws and run the lead to the charger, secured and away from sharp edges.
  • 4.  To charge, open the cap and connect the extension lead from outside.
  • 5.  Afterwards, disconnect the lead and snap the cap shut.

Features

  • ✓  AC inlet with a built-in 3.66 m (12 ft) lead and single AC outlet.
  • ✓  15 A rated capacity and 14 AWG copper cable.
  • ✓  Useful for battery chargers, engine block heaters and exterior inlets on lorries, trailers, boats or motorhomes.
  • ✓  No hard-wiring: a 51 mm hole, three screws and done.
  • ✓  Self-tapping screws suitable for fibreglass, wood, plastic or metal.
  • ✓  Snap cap with rubber seal for a watertight closure; 0.67 kg including lead.
  • ✓  Supplied with the cap and 3 self-tapping screws.

Technical data

Rated current15 A
AC outputSingle
Cord length3.66 m (12 ft)
Cable gauge14 AWG, copper
Mounting hole51 mm (2")
Weight0.67 kg

In the box

  • ✓  GCP1EX port plug with 3.66 m cord
  • ✓  Pressure-fit cap
  • ✓  3 self-tapping screws

  • Brand
  • Reference
    BCASA-NOCO-GCP1EX
  • MPN
    GCP1EX

noco-gcp1ex-ficha-tecnica.pdf

Download (1.72MB)
Secure payment
Your payment details are encrypted.
24-hour shipping
To Spain and Portugal. 14-hour urgent service.
Free returns
No additional cost.
Loading...
Back to top